Shanghai International Logistics Co., Ltd.
Freight transport: Compliance, Documents, Insurance and Claims
Freight transport transactions are reconstructed after the fact from documents, so claims and insurance recoveries depend on the quality of that chain. It starts before the goods move: the booking confirmation identifies the parties, the invoice establishes what was sold, the packing list defines units and gross weight, and the transport document ties those particulars to a vehicle or voyage.
The proof of delivery is the terminal document of the chain, and narrower than often assumed. It evidences receipt at destination and, usually, outer packaging condition at unloading. It does not establish the condition of the contents. Record carrier, waybill number, delivery date and time, receiver name and signature, package count, seal condition, and any exception written on the document.
The CMR consignment note is the road freight document under the CMR Convention. It is prima facie evidence of the conclusions on its face, including the apparent condition of the goods, but not a title document. A qualified reservation written before signing removes the carrier's presumption that the goods were sound on handover, so a clean signature weakens the consignee's later claim. CMR also caps liability at 250 SDR per package or 8.33 SDR per kilogram.
| Document | Purpose | When required |
|---|---|---|
| Invoice, packing list | Value, packages, weights | All shipments; customs |
| CMR note | Carriage contract, condition evidence | International road transport |
| Bill of lading | Title document, sea receipt | Sea and multimodal transport |
| Proof of delivery | Receipt, outer condition | All shipments; damage claims |
Cargo insurance is written for a specific consignment or under an open cover policy attaching to successive shipments. An all-risks policy covers fortuitous loss subject to stated exclusions; a named-perils policy covers only listed events and puts the burden on the insured to show that one caused the loss. An open cover requires a written contract of insurance on the despatch date, with each shipment declared and the premium paid; without it, cover has not attached.
Inherent vice, the tendency of goods to deteriorate or react to their own composition or environment, such as rusting, condensation under a tarpaulin or caking of hygroscopic chemicals, is excluded from standard cover and from carrier liability alike. Insufficient packing is also excluded and is separately a defence for the carrier. If the loss arose from the packing or an internal property of the goods, neither insurer nor carrier pays, however obvious the damage looks.
| Structure | How cover attaches | Practical use |
|---|---|---|
| Single shipment policy | Declared before despatch | Irregular moves, high value cargo |
| Open cover policy | Master contract, declaration per shipment | Regular shipments on known lanes |
| All-risks cover | Broad perils, stated exclusions | Where the cause of loss is uncertain |
| Named-perils cover | Listed perils only | Where loss cause can be controlled |
Incoterms 2020 allocate cost, risk and delivery obligations between seller and buyer. They do not allocate title and do not determine who may claim from a carrier or insurer. Their value is fixing the point at which risk of loss sits, and so when insurance must be in place.
Under EXW risk passes at the seller's premises, leaving the seller bearing loading and the whole journey. Under FCA risk passes when the goods are handed to the buyer's carrier, and under FOB when they pass on board at the port of shipment. CIF adds the seller's carriage and insurance obligation while risk still passes on board. Under DAP risk passes at the named destination, unloaded, and DDP adds duty and clearance. With DAP or DDP the seller's exposure extends to the destination, so insurance must reach there. With FCA, define the handover by a named terminal and place.
Handover inspection is the cheapest element of a claims file and the one most often skipped. It should answer three questions: was the outer packaging as described on the consignment note, was the seal intact and matching the recorded number, and is there any externally visible sign of damage, moisture or contamination. It does not answer what is inside the packaging. Make it routine: give the receiver a checklist, authority to refuse or to sign with reservation, and camera access.
Photographs fail for predictable reasons: too few angles, no scale, no context, no link to the shipment. Capture the overall scene before anything is moved, then the damage from a fixed distance, then a close-up, always with an object of known size in frame. Keep the originals with their metadata and do not crop them. Write a short contemporaneous note of what was seen, by whom and when, and preserve the packaging until the claim closes.
Damage patterns are informative because shipping and handling damage is not random. For each damaged item, ask whether the cause is consistent with a handling event, the packing, the environment or the goods themselves, then test that against documents.
Two questions do most of the causal work: was the damage present at handover or did it appear afterwards, and was the consignment exposed to foreseeable risk in the way it was loaded?
The sequence in a claim matters more than its length. Notify the carrier or insurer promptly and in writing through the route stated on the policy or carriage contract, stating the loss, the shipment reference and the estimated value. Most policies impose a notice period counted in days from delivery or discovery; under CMR the customary periods are twenty-one days for apparent damage and seven for hidden damage. Missing that window is common and fatal.
The claim file should hold the transport document, invoice and packing list, the proof of delivery with any reservation, dated photographs, the internal examination report, the surveyor's report, the repair invoices, and a short chronology. Where cause is packing-related, the packing specification and packing-operation photographs matter most. A surveyor is a neutral expert appointed to establish the fact and extent of the loss, appointed by the insurer in some markets and by the insured in others. Do not dispose of damaged goods before the survey.
| Evidence | What it establishes | Common weakness |
|---|---|---|
| Transport document, CMR note | Carriage contract, prima facie condition | Clean signature reduces recourse |
| Proof of delivery | Receipt and outer condition | Silent on the contents |
| Photographs with scale | Nature and extent of damage | Metadata lost after re-saving |
| Surveyor's report | Independent fact and extent of loss | Must be instructed early |
| Repair invoices | Quantum of the loss | Obtained before survey weakens position |
Carrier liability is set by the applicable convention or contract, and is often below the value of the goods. For international road carriage the CMR ceiling of 250 SDR per package or 8.33 SDR per kilogram applies unless the carriage contract provides otherwise; higher limits are agreed in writing and must be located before loading. Sea carriage under the Hague Rules caps liability at 666.67 SDR per package or two SDR per kilogram, the 1971 IMO rules raising the package figure to 1000 SDR. Air carriage uses the Warsaw limit of 250 SDR per kilogram.
Protecting the claim has three parts. Establish the applicable regime and ceiling early, since it determines what is worth pursuing. Where exposure sits above the ceiling, either agree a higher limit in the carriage contract or insure the difference, and cargo policies commonly respond only above the carrier's liability. Where conditions of carriage exclude liability for certain causes, build the file to address the exclusion directly.
Dangerous goods movements are governed by the IMDG Code for maritime, the ICAO Technical Instructions and ICAO Annex 5 for air, and ADR for road in Europe, with equivalent national rules elsewhere. Compliance is verified through the dangerous goods declaration, the packed goods statement, the packaging specification marking, and emergency response information for the vehicle or vessel. These must agree: a declared class that does not match the packaging marking will stop a consignment at a terminal, and a declaration inconsistent with the safety data sheet signals a classification error.
The practical checks are the correct UN number and proper shipping name, class, packing group and subsidiary risks, packaging type and its UN specification mark, labels and placards, emergency response information, segregation and stowage for mixed loads, and the training records of those handling the goods. Marine pollutants, lithium batteries and salvage packaging account for many carrier rejections. Because dangerous goods attract stricter inspection, keep the record chain to the standard used for general cargo.
There is no fixed period, because the duration follows the policy terms and the complexity of the evidence. A straightforward transit damage claim with a clean document set can close quickly once a surveyor has reported. A disputed claim involving packing causation takes longer, because each party needs time to review the file.
Prove the chain, not just the damage. The transport document and consignment note establish what was handed over and in what apparent condition, the proof of delivery establishes receipt at destination, and photographs at handover and delivery connect the two. Where the contents were opened, a contemporaneous teardown report establishes the condition beneath the packaging. Then connect cause: loading plans and packing specifications address whether the damage fits handling, and equipment logs address reefer performance.
No, but it makes the claim harder to sustain. A clean signature confirms receipt and, on most forms, that the outer packaging appeared sound on arrival. It does not establish that the contents were sound, and it does not preclude a claim where the loss was concealed at delivery and discovered on opening. Under CMR, a qualified reservation written before signing removes the carrier's presumption of sound condition, so consignees should write reservations rather than accept the goods. Hidden damage runs on a shorter period, often seven days.
Choose the rule that matches where the seller can control the carriage and where the real risk of loss sits, then make the handover point unambiguous. A buyer with its own carrier relationships often uses FCA at a named terminal and place, avoiding the uncertainty of EXW and keeping control of the main carriage. A seller without that capability tends toward DAP or DDP, accepting longer seller exposure and heavier insurance. Whatever the rule, state the risk transfer point and match insurance to it.